Load Break Switch Closing Operation
Insert the operating handle into the closing operation shaft hole (bottom right corner) and rotate 180° clockwise. The mechanism drives the contacts to quickly perform the load switch closing action, while the spring charges in preparation for opening.
Load Break Switch Opening Operation
Press the opening button to trigger the trip, releasing the energy in the opening spring. The mechanism drives the main shaft to complete the rapid opening operation
Load Break Switch Earthing Operation
The earthing operation of the CT□-□C/XJ(For Fuse-Switch) is same as the CT□-□C(For LBS).
Load Break Switch Closing Operation
Insert the operating handle into the closing operation shaft hole (bottom right corner) and rotate 180° clockwise. The mechanism drives the contacts to quickly perform the load switch closing action, while the spring charges in preparation for opening.
Load Break Switch Opening Operation
Press the opening button to trigger the trip, releasing the energy in the opening spring. The mechanism drives the main shaft to complete the rapid opening operation
Load Break Switch Earthing Operation
The earthing operation of the CT□-□C/XJ(For Fuse-Switch) is same as the CT□-□C(For LBS).
